The weather was very cooperative over the weekend as we
inched ever closer to wrapping up the exterior elements of the mudroom and deck
addition.
On Saturday, Ryan closed in the old door and began shingling
over the new elevation. I did a final patch-and-sand on the deck posts. We also
found the perfect post caps - they are the right size and flat on the top
(my stipulation), just right for setting a drink on.
You might notice we have not installed the railings and balusters
that we mentioned earlier in the project. We’ve made a change to the plan after
noticing how nice it is to hang your legs off the deck. Here’s Frank and Ryan
demonstrating this a couple weeks back.
Additionally, since the deck is less than 30-inches off the
ground, code does not require that we have railings. We have a new plan that we
are very excited about, but you’re just going to have to wait and see what it
is.
Our highlight of the afternoon was visiting Sarah and Chris’
new pad. They are bringing in some hired
muscle for necessary upgrades (smart kids), but are taking on much of the
second and third floor themselves. Great
house. Great ceiling height. Great new neighbors. (We’re just about as excited for us as we are
for them!) Here’s a shot I robbed from
Sarah… almost made me nostalgic for our unfinished first floor. Almost.
On Sunday, we put the ladder jack staging across the deck so
that I could reach the gable’s trim for patching and sanding. While I worked on that, Ryan finished one
last post, attached the post caps and used up the rest of the shingles. We’ll need to get one more bundle to finish
up the remaining exterior walls.
With patching and sanding complete, we spent Sunday
afternoon priming trim. We used an
oil-based primer on the posts to protect against water damage and latex on the
rest. Next week, we will put on the top
coat and hope to finish up the majority of the remaining trim! Should be looking pretty close to finished (on
the outside) come November 1.
As for the lawn… we are watering, watching and waiting.
Though we were told germination needs at least four good
days, upon further research we’ve learned that depending on the season, it can
take anywhere from seven to fourteen days.
I also just read that the salt marsh hay should be thick enough to keep
in the moisture and protect against birds, but thin enough that sunlight gets
through, so I might thin up our cover slightly. We are watering it with the
sprinkler for at least a half-hour each day (except on days that it
rains). Any lawn experts out there? Are we doing this right?